IncPres - Company News and Business Information
No Result
View All Result
No Result
View All Result
IncPres - Company News and Business Information
No Result
View All Result
Home India

L&T Completes Gasification Plant Project for Linde Engineering, Singapore

photoact by photoact
November 23, 2022
in India
0
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter


  • Modules weighing 34,000 MT, fabricated by L&T at its Modular Fabrication Facility at Kattupalli, India and shipped to Singapore

Mumbai: Larsen & Toubro, an Indian multinational engaged in EPC projects, hi-tech manufacturing, and services, has completed the supply of 46 Nos. of Process & Piperack Modules to Linde Engineering, Singapore for a gasification complex. After the commencement of operations, Linde will produce and supply hydrogen and synthesis gas from the plant. 

On this occasion, Mr. Subramanian Sarma, Whole-Time Director & Sr. Executive Vice President (Energy), L&T, said: “A complete pitch gasification project was conceived to be built by Linde Engineering in modular form and shipped to Singapore for installation. Linde explored numerous fabrication yards throughout the world before settling on L&T’s Fabrication Facility at Kattupalli, close to Chennai in India for fabrication of these large Process and Piperack Modules.” 

L&T’s Modular Fabrication Facility at Kattupalli on the east coast of India is equipped with robust infrastructure and machinery to handle large volumes of complex module fabrication, a dedicated marine jetty with an admirable quality and safety performance in its operations. 

The project had modules with various metallurgies viz. low-temperature carbon steel, low alloy, and Inconel materials totaling 34,000 Metric Tons (MT) with extensive shop-applied fireproofing and cold/hot insulation. Among many other milestones, the manufacturing and shipment of large modules — the heaviest being 2,800 MT and the tallest being 51 meters (m) (equivalent of a 11-storey building) with a base footprint of 35m x 21m represent the magnitude and complexities involved. The project team followed stringent test specifications for the oxygen service apart from implementing a Clean spool policy and Flange management system across the entire scope. 

The loadout and sea-fastening of all 46 Modules in 10 shipment lots was successfully completed, and the last module departed from Kattupalli on 18 October 2022. 

L&T is proud to be a partner of Linde in this prestigious project and wishes the Linde team, a safe completion & successful start-up of the plant. 

L&T, through its Energy – Hydrocarbon division, with over three decades of rich and extensive experience in EPC businesses, offers comprehensive Modular Solutions, primarily for Onshore and Offshore Oil & Gas Industry including deep-water SPS/SURF projects and Offshore Wind Farm projects from its strategically located three Modular Fabrication Facilities at Hazira (India’s west coast), Kattupalli (India’s east coast) and Sohar (Oman) which are equipped with state-of-the-art infrastructure and machinery for operations, fine-tuned execution procedures leading to a combined annual capacity of about 200,000 MT for fabrication of large and complex Modules. It has recently augmented manufacturing strengths by starting a new Integrated Manufacturing Facility for modules, process skids, piping, and a high-thickness Pressure Vessels Facility at Jubail in the Kingdom of Saudi Arabia.



Source link

Related

L&T ropes in Green Energy stalwarts to form Green Energy Council

L&T Construction Wins (Large*) Orders for its Power Transmission & Distribution Business

L&T Construction Wins (Significant*) Orders for its Buildings & Factories Business

Tags: L&T
ShareTweetSendSharePinShareSend

RelatedNews

L&T ropes in Green Energy stalwarts to form Green Energy Council

by photoact
May 31, 2023
0

Green Energy Council Formed to Bolster L&T's Resolute Commitment to Carbon Neutrality by 2040 Formation of council in line...

L&T Construction Wins (Large*) Orders for its Power Transmission & Distribution Business

by photoact
May 23, 2023
0

Mumbai: The Power Transmission & Distribution (PT&D) Business of Larsen & Toubro (L&T), Construction has recently secured EPC orders in India...

L&T Construction Wins (Significant*) Orders for its Buildings & Factories Business

by photoact
May 18, 2023
0

Mumbai, May 17, 2023: The Buildings & Factories (B&F) Business of Larsen & Toubro (L&T)Construction has recently secured EPC orders...

Larsen & Toubro Announces Leadership Transition

by photoact
May 12, 2023
0

A M Naik to be Chairman Emeritus S N Subrahmanyan to be appointed Chairman and Managing Director from 1st...

Financial Results for the period ended March 31, 2023

by photoact
May 11, 2023
0

Financial Results for the period ended March 31, 2023 Source link

President of India lays foundation stone for L&T Skill Training Hub in Odisha’s Mayurbhanj

by photoact
May 4, 2023
0

Mumbai: The Honourable President of India, Smt Droupadi Murmu, today laid the foundation stone for L&T Skill Training Hub at...

ADANI Adani Enterprises Adani Group Aditya Birla Group Airtel Ambuja Cement Apollo Hospitals Apple Inc Bajaj Auto Bank of America Cigna Corporation Cognizant India Dabur India Dalmia Bharat Exxon Mobil FedEx Corp General Electric Godrej Group HAL Home Depot ICICI Bank Indian Bank Infosys JPMorgan Chase & Co Kubota Corporation L&T Mahindra & Mahindra Meta Platforms Microsoft National Aluminium Company Nestle India Royal Dutch Shell Samsung Global Saudi Aramco Standard Chartered Bank Steel Authority of India Sun Pharma Target Corporation Tata Consumer Products Tata Motors Tata Power Tata Steel UltraTech Limited Verizon Communications Voltas Limited

    © 2022 incPres.com

    No Result
    View All Result

      © 2022 incPres.com